Air Freightable Capping Stack(2)

Air Freightable Capping Stack

PROJECT
Subsea Well Response Project (SWRP)
EPC
Oil Spill Response Limited
YEAR
2022
CARGO
105t 7-1/16” 15 KSI Capping Stack
LOCATION
Singapore
SERVICES
  • Land Transport Lashing Design and Calculation
  • Multi-axles Stability and Strength Calculation
  • Maneuvering Plan of Capping Stack
  • Step-by-Step Lifting Procedure for the Trial Fit of Air Freight Frame
  • Lifting Plan and Calculation
  • Weighing and CoG Computation
  • Capping Stack Mobilisation Plan and Procedure (by Sea)
  • Capping Stack Mobilisation Plan and Procedure (by Air)
  • Method Statement for the Trial Fit of Air Freight Frame
  • Supply of Load Cells and Rigging Gears