Tower System photo-1 (2)

Tower Lift System with Strand Jacks

PROJECT
Exxon Mobil Singapore Lubes Expansion Project 2
EPC
Amec Foster Wheeler
YEAR
2017
CARGO
800t HDA Reactor
LOCATION
Singapore
SERVICES
  • Tower Lift Structural Integrity Check
  • Cross Head Girder Structural Check
  • Stool Structural Check
  • Capping Beam Structural Check
  • Strand Jacks Support Beams Structural Check
  • Trunnion Connection Structural Check
  • Swivel Structural Check
  • Singapore Registered PE Endorsement of Tower Lift System