![Air Freightable Capping Stack(2) Air Freightable Capping Stack(2)](https://royden-jayston.com/wp-content/uploads/2022/08/Air-Freightable-Capping-Stack2-scaled.jpg)
2022
Air Freightable Capping Stack
- Installation - HeavyLift
- Site Attendance
- Transportation
![180t Aluminium Ferry (2) 180t Aluminium Ferry (2)](https://royden-jayston.com/wp-content/uploads/2023/08/180t-Aluminium-Ferry-2-scaled.jpg)
2022
A0133 Aluminium Monoholl Ferry ‘North-South 2’
- Installation - HeavyLift
- Loadout
- Site Attendance
- Transportation
![PVD-V-Spreaders PVD-V-Spreaders](https://royden-jayston.com/wp-content/uploads/2021/08/PVD-V-Spreaders.jpg)
2021
DNV Approved Spreader Beams Design & Fabrication
- Equipment Design
- Installation - HeavyLift
![Sheerleg lift of reel Sheerleg lift of reel](https://royden-jayston.com/wp-content/uploads/2019/11/Sheerleg-lift-of-reel.jpg)
2019
Bison Iguana & Gajah Puteri – Reels
- Installation - HeavyLift
- Loadout
![Lift & go Lift & go](https://royden-jayston.com/wp-content/uploads/2023/05/Lift-go.jpeg)
2019
Lift & Go for Tanks
- Installation - HeavyLift
- Loadout
![Pipes Loading with HLV (2) Pipes Loading with HLV (2)](https://royden-jayston.com/wp-content/uploads/2018/04/Pipes-Loading-with-HLV-2-scaled.jpg)
2018
Drilling Equipment Pipes Loading
- Installation - HeavyLift
- Loadout
- Site Attendance
![sdr sdr](https://royden-jayston.com/wp-content/uploads/2023/04/202103221520208847.jpg)
2018
Modules Lifting – Barge to Heavy Lift Vessel
- Installation - HeavyLift
![Module-Lifted-Loadout-2 Module-Lifted-Loadout-2](https://royden-jayston.com/wp-content/uploads/2018/01/Module-Lifted-Loadout-2-scaled.jpg)
2018
Lifted Loadout of Modules
- Installation - HeavyLift
- Loadout
- Site Attendance
- Transportation
![Tower System photo-1 (2) Tower System photo-1 (2)](https://royden-jayston.com/wp-content/uploads/2017/11/Tower-System-photo-1-2.jpg)
2017
Tower Lift System with Strand Jacks
- Installation - HeavyLift
- PE's Endorsement